Plastic Processed: HDPE, HDPE/PP, PE/PP, Lldpe, ABS/PP
Condition: New
Output (kg/h): 200 - 350
Place of Origin: Zhejiang, China
Brand Name: TP
Type: Granulating Production Line
Screw Design: Single
Voltage: Customized, Customized
Dimension(L*W*H): 4500*1200*1200mm-2000*710*400mm
Power (kW): 45+18.5KW
Weight: 4T
Warranty: 1 Year
Showroom Location: Egypt, Turkey, Russia
Applicable Industries: Manufacturing Plant, Farms, Home Use, Energy & Mining
After-sales Service Provided: Free spare parts, Field installation, commissioning and training, Online support, Video technical support
After Warranty Service: Video technical support, Spare parts, Field maintenance and repair service
Local Service Location: Egypt, Canada, Turkey, United Kingdom, Italy, Philippines, Brazil, Indonesia, Pakistan, Mexico, Russia, Malaysia, Australia, Argentina
Certification: ISO
Gearbox: Hard-teeth
Mould: Hydraulic filter changer
Color: Customized
Heating method: Cast-Al heating
Capacity: 20 sets/ month
Power: Customized
The professional technical service is promised.
1, Free spares support.
2, Free operator training.
3, Video&Camera online teaching and problem solving.
4, Technical person assembling and testing in your factory.
5, Discussing with the clients for the other solutions of the puzzles need to be served.
(1) Pay attention to the temperature change of the fuselage at any time. When touching the strip with a clean hand without touching it, it should be heated immediately. It is normal until the note touches hands.
(2) When the bearing part of the reducer burns or is accompanied by noise, it shall be shut down for maintenance in time and supplemented with oil.
(3) When the bearing parts at both ends of the main engine bearing room burn hands or make noise, stop the machine for maintenance and add grease. During normal operation, the bearing chamber shall be installed every 5-6 days
Add butter once.
(4) Pay attention to find out the operation law of the machine; For example, if the machine temperature is high or low, and the speed is fast or slow, it can be handled in time according to the situation.
(5) When the fuselage is unstable, pay attention to check whether the clearance of the coupling fitting is too tight, and adjust it in time.